The call comes in at seven on a Tuesday. A loader bucket cracked at the hinge, and they need it for feeding by the weekend. Can you come out?
You can. You load the truck, drive forty minutes, and look at it. It is worse than the photo. The crack runs under the wear plate, so the plate has to come off first.
Three and a half hours later it is welded, hardfaced and back on the loader. You went through most of a box of rod from the truck, and a piece of AR400 you had been saving. You write "Hillcrest, bucket, about 3 hrs" on the back of a fuel receipt and head to the next one.
The truck is a bad filing cabinet
The invoice goes out the following week. By then the fuel receipt is somewhere under the seat, so you write it from memory. Three hours of welding. Material, call it a hundred.
What you forgot: the forty minutes each way. The half hour getting the wear plate off. The rod. The fact that the AR400 was a good-sized offcut, not a scrap.
None of it is a lot on its own. Together it is a couple of hundred dollars of work you did and did not bill. And it happens on the calls that go well, not just the ones that go wrong.
The next quote is wrong too
Here is the part that costs more. Next spring a neighbouring farm calls with the same bucket and the same crack. You remember Hillcrest as "about three hours", so that is what you quote.
The real job was closer to five. You did not just lose the money once. You wrote it into your price.
Site time is the time that goes missing
Shop work has a bench, a job folder and a clock on the wall. Site work has a truck, a phone and whatever you remember on the drive home. So site hours, travel and the material you grabbed from the truck are exactly the costs that do not make it back.
A few habits fix most of it:
- Quote site work as its own lines. Travel, on-site welding and shop fabrication are different work at different rates. Lumping them together hides which part ran over.
- Put the material on the quote by weight. Plate and rod are easy to forget once they are welded on. If they are a line from the start, they are on the invoice.
- Write the hours down where the job lives, not on a receipt. Against the job, the same day.
- Compare before the next quote. What did the last similar repair really take? Quote that, not the version you remember.
What this looks like in Quotara
In Quotara, any line on a quote can be marked as site work with a click. Travel and on-site welding sit on the same quote as the shop fabrication, each at its own rate, and the material goes on by the kg or lb from your own prices.
When the quote becomes a work order, the site lines stay marked. The hours your crew clocks go against those lines, and job costing shows the site part of the job next to the shop part, quoted against actual. Next time a similar repair comes in, Quinn prices it from what that job really took, not from the fuel receipt.
Customers often just send a note and a few photos. Forward the email to your Quotara address and Quinn reads the photos and drafts the quote for you to check. When the job is done, send it to QuickBooks Online as an invoice, material and taxes included.
Try it on the next call
Next time the phone rings for a site repair, quote the travel and the site welding as their own lines, and the material by weight. When you are done, look at what it really took.
See how Quotara works for welders, or try it free for 14 days. No credit card required.